The history of the cable cars of See started back in 1972, with the expansion of Medrig Alm ski resort. Back then, only one single one-seater chairlift and one drag lift took guests up the mountain.
Today, around 50 years later, you can choose from eleven state-of-the-art cable cars and lifts with a transport capacity of 11,500 passengers per hour.
Read on to find out more about the cable cars of See!
The first steps
From the beginnings to the first Snowboard funpark
1972 To 1997
1972–1973: first operation of Medrigjochbahnen lifts with a one-seater chairlift (ESL-Medrigjoch) and a drag lift (Rauhkopflift) plus opening of Medrig Alm mountain restaurant
1976: construction of Almlift
1978: construction of Panoramalift
1983: construction of ESL-Zeinis chairlift
1990: completion of 6-EUB-Medrigjoch cable car, construction of 4-SB-Rossmoos chairlift and restaurant extension to 250 seats
1991: expansion of the snow-making system and construction of the toboggan run
1993–1994: construction of the restaurants at Gratli, construction of a sports shop right at the ski resort, expansion of snow-making facilities and implementation of a new flood-lighting system for the toboggan run
1997: new Snowboard funpark
Continuous development
New slopes and lifts
2001 to 2010
2001: construction of the new Zeinisabfahrt run, construction of a practice area above the Medrig Alm panoramic restaurant and a new health and wellness park behind the panoramic restaurant
2002: replacement of the Zeinis one-seater chairlift with a six-seater chairlift, construction of a button lift, a rope lift and a conveyor belt at the practice area, expansion of the snow-making system and new lighting for the night skiing slope at the new Zeinisabfahrt run
2003: construction of the kindergarten and electrification and reconstruction of Medrig Alm drag lift
2005: construction of Versingabfahrt run, planning and construction start of avalanche blasting ropeways Versing I and Versing II as well as construction of explosives storage facilities
2006: completion of Versingabfahrt run and the explosives storage facilities as well as expansion of the snow-making system
2007: expansion of the snow-making system as well as construction of the umbrella bar at Gratli
2008: start of the realignment of the valley run and construction of a parking lot with 350 parking spaces right by the valley station of the cable car as well as construction of Medrig Alm ice bar
2009: snow-making and energy generation system: 3 new powerhouses (one pumping station, 2 water-power plants), completion of pipe installation and snow-making system at the valley run plus realignment of the valley run and purchase of a new conveyor belt for the practice area
2010: expansion of snow-making facilities, reconstruction of the free-flow area at Medrig Alm panoramic restaurant, various slope construction works (improvement of Gratabfahrt run, “Adrenalin” run), construction of Gratli ski bridge, completion of the energy generation system, establishment of a new piste guidance system and a local information channel
Continuous optimisation
Further expansion of the ski resort
2011 until today
2011 until today: ongoing expansion of the ski resort
2011: construction of a playground at the mountain station of the cable car and expansion of the snow-making system
2012: expansion of the snow-making system (full snow-making possible since the 2012/2013 winter season), extension of the panoramic restaurant and construction of the filling station for snowcats
2013: expansion of the snow-making system, renovation of the washing area, planning of Versingbahn cable car
2014: construction of 8-EUB-Versingbahn cable car, the snow-making facilities at the intermediate pumping station, the sewage system and the 25 kV network, slope construction works (avalanche deflection dam) and construction of the SkyBar
2015: expansion of the snow-making system (19 tower guns)
2016: construction of the workshop hall and offices, automation of the snow-making system (5 snow guns) and construction of a detonation tower
2017: expansion of the snow-making system, improvements to the toboggan run, opening of the new ice bar at Medrig Alm panoramic restaurant and reconstruction of the ski cellar
2018: new electrics and extended snow-making facilities (valley run) for 6-EUB-Medrigjoch cable car, improvements to the toboggan run (route widening and planking), slope improvement works (valley run, Versingabfahrt run)
2019: improvement of former slope 2b, additional planking for the toboggan run
2020: adjustments to today’s slope No. 32 (snow-making facilities, new piste guidance system incl. panorama), repair works at the terrace of Gratli restaurant
2021: new 48-metre conveyor belt at the practice area, slope adjustments at Gratabfahrt run
2022: construction of 8-EUB-Furglerblick cable car, slope construction (avalanche deflection dam as well as a 1.2-kilometre blue run) and implementation of a new snow-making system